Established in 1997 as a used equipment services company our business has continually evolved and is now primarily focused on delivering complete used/surplus power plant solutions on an EP or EPC (Engineering, Procurement and Construction) basis. We have developed a particular niche in used/surplus new Biomass/WTE power plants. By utilising used/surplus equipment, we are uniquely positioned to provide a complete package solution, whilst simultaneously offering a HUGE CAPEX saving VS a traditional ‘new’ plant EPC.

24.5MW Biomass Fuelled Power Plant (USED/NEW) 50Hz
24.5MW Biomass Fuelled Power Plant Condition: New (Boiler) / Unused - Surplus - (Steam Turbine-G...
77MW Combined Cycle Power Plant (UNUSED) 50Hz
77MW Combined Cycle Power Plant Unused, Partially installed. Year of Manufacture: 2016-2017 Co...
63MW Rolls Royce Trent 60 DLE Gas Turbine-Generator Package (UNUSED) 50Hz
1 x 77MW Gas Turbine-Generator Package Partially installed, never operated. Year of Manufacture...
2 x 5.5 MW Solar T60 Gas Turbine-Generator Packages (USED) 50Hz
2 x Solar T60 Gas Turbine-Generator Packages Year: 2008 Condition: Used Hours of operation: ~1...
1 x 2MW MTU 204000L62 Natural Gas Engine-Generator Package (USED) 50Hz
1 x 2MW Natural Gas Fuelled Engine-Generator Set Condition: Used Hours of Operation: ~33,500 S...
1 x 16.43MW Condensing with Extraction Steam Turbine-Generator Package (USED) 60Hz
1 x 16.43MW Condensing with Extraction Steam Turbine-Generator Package Condition: Used Year of ...
1 x 6.1MW Condensing Steam Turbine-Generator Package (USED) 50Hz
1 x 6.1MW Condensing Steam Turbine-Generator Package Condition: Used Year of Manufacture: 2006 ...
40MW Combined Cycle Power Plant CCGT (Unused) 50Hz
40MW Combined Cycle Power Plant Unused. Installed but never operated/ New Year of Manufacture: ...
1 x 20MW Combined Cycle Cycle Gas Power Plant - CCGT - (UNUSED) 50Hz
20MW Combined Cycle Power Plant Unused. Installed but never operated. Year of Manufacture: 2014...
1 x 15MW Solar Titan 130 Gas Turbine-Generator Package (UNUSED) 60Hz
1 x Solar T130 Gas Turbine-Generator Package. Year: 2011/12 Condition: Unused (Never Installed)...
25MW Condensing Steam Turbine-Generator Package (NEW) 50 Hz
Unused (NEW) 25MW Condensing Steam Turbine-Generator Package. As new, never installed, in storag...
1 x 2MW Biomass Power Plant (USED) 50Hz
2MW Biomass Fuelled Power Plant (Wood Chip) Condition: Used Hours of Operation: ~25,000 Only T...