UEN 2329
Size: 2MWe
Type: Combined Heat and Power
Fuel: Natural Gas
Year Manufactured: ~2005
Hours: ~12,000 Only
Condition: Very Good
Major Equipment:
2 x Kawasaki Gas Turbine-Generators (1 x 1,770 kV at a voltage of 10.5 kV & 1 x 750 kVA at a voltage of 0,4 kV
Flue gas supply line to the waste heat boiler .
Feed water tank with switch cabinet .
Waste heat boiler 27bar, steam production – 7 tons/hr
Stack